With general construction, productivity is the chief goal. Many solutions offer a look into material cost, but iTWO delivers a collaborative platform that reveals estimation, progress, and forecasting all in one. General contractors can assign labor more efficiently, and save significant time through virtual planning. With iTWO, owners are able to use benchmarking to see where they’ve been and the exact steps that need to be taken to improve performance in the future.
Increase Bid & Estimate Accuracy
Mitigate Cost and Schedule Risks
Visualize & Analyze Project Performance
Save Time Collecting & Reporting Project Performance
Make Accurate Predictions of Cost & Schedule
Flexibility in Forecasting
Integrated Project and Financial Forecasting
Thanks to the 3D model, iTWO can extract the quantities based upon the design to enhance the estimating process, improve the benchmarking validation and enable values for engineering options to be undertaken in time with the design changes.
Time gained due to the synergy of integrating the 3D design to cost and time will significantly enhance and enrich the data sets of the project for all the professional disciplines involved. Initial analysis by construction customers suggest savings in time and cost potentially of up to 30%.
Early warning of design errors before building begins through clash detection. This will enable the commercial team to validate the design process prior to commencement on site and seek early resolution to variation and changes.
Quantities can be tracked in line within the design plan and actually be delivered on site for increased control and performance monitoring over the life cycle.
iTWO makes managing complex projects more transparent and more secure. Risk reduction can be achieved by integrating planning and design decisions within iTWO.
Changes to the building procedure and the resulting changes to costs and deadlines can be easily and clearly performed on the model.
Using RIB iTWO you can simulate different design variables, calculation processes and execution variables, which precisely follow, control and minimize the risk profile by selecting and deselecting variables virtually before construction starts. The result of the process is significant with reduction of up to 80% in change orders, a more stringent cost profile and totally minimized risk.
Hear how iTWO can create value in your construction project
Reduce inefficiency, waste, and re-work
Reduce inefficiency, waste, and re-work
When it comes to heavy civil infrastructure, it’s often the details that tell more of the picture than merely the cost. RIB understands this, and provides in-depth details on equipment and crew productivity so project owners can maximize production every day. The labor on a project can make or break the budget and overall execution, and iTWO is a solution that can zero in on labor efficiency not just tools and materials. By fostering real-time visual representation of percentages completed and cross-project reporting, civil project owners can make adjustments on the fly and save considerable time and money as a result.
Increase Bid & Estimate Accuracy
Mitigate Cost and Schedule Risks
Visualize & Analyze Project Performance
Save Time Collecting & Reporting Project Performance
Make Accurate Predictions of Cost & Schedule
Flexibility in Forecasting
Integrated Project and Financial Forecasting
Thanks to the 3D model, iTWO can extract the quantities based upon the design to enhance the estimating process, improve the benchmarking validation and enable values for engineering options to be undertaken in time with the design changes.
Time gained due to the synergy of integrating the 3D design to cost and time will significantly enhance and enrich the data sets of the project for all the professional disciplines involved. Initial analysis by construction customers suggest savings in time and cost potentially of up to 30%.
Early warning of design errors before building begins through clash detection. This will enable the commercial team to validate the design process prior to commencement on site and seek early resolution to variation and changes.
Quantities can be tracked in line within the design plan and actually be delivered on site for increased control and performance monitoring over the life cycle.
iTWO makes managing complex projects more transparent and more secure. Risk reduction can be achieved by integrating planning and design decisions within iTWO.
Changes to the building procedure and the resulting changes to costs and deadlines can be easily and clearly performed on the model.
Using RIB iTWO you can simulate different design variables, calculation processes and execution variables, which precisely follow, control and minimize the risk profile by selecting and deselecting variables virtually before construction starts. The result of the process is significant with reduction of up to 80% in change orders, a more stringent cost profile and totally minimized risk.
Hear how iTWO can create value in your construction project
An end-to-end solution meeting the unique challenges
of power generation, transmission & distribution
An end-to-end solution meeting the unique challenges
of power generation, transmission & distribution
Power related construction is among the most unique in the industry – Construction for power generation, transmission and distribution requires skills and knowledge that’s becoming harder and harder to find. iTWO is designed to achieve project continuity and centralized data retention to help teams transition knowledge from one project to the next.
Measure off the model-3D Scoping (optional)
Establish a Reliable Project Budget
Integrate scope, cost, and schedule with ease
Project visualization makes each role more efficient
Manage risk, opportunities, and contingency
Capture knowledge and apply it to your next project
More time and resources for PLM
Thanks to the 3D model, iTWO can extract the quantities based upon the design to enhance the estimating process, improve the benchmarking validation and enable values for engineering options to be undertaken in time with the design changes.
Time gained due to the synergy of integrating the 3D design to cost and time will significantly enhance and enrich the data sets of the project for all the professional disciplines involved. Initial analysis by construction customers suggest savings in time and cost potentially of up to 30%.
Early warning of design errors before building begins through clash detection. This will enable the commercial team to validate the design process prior to commencement on site and seek early resolution to variation and changes.
Quantities can be tracked in line within the design plan and actually be delivered on site for increased control and performance monitoring over the life cycle.
iTWO makes managing complex projects more transparent and more secure. Risk reduction can be achieved by integrating planning and design decisions within iTWO.
Changes to the building procedure and the resulting changes to costs and deadlines can be easily and clearly performed on the model.
Using RIB iTWO you can simulate different design variables, calculation processes and execution variables, which precisely follow, control and minimize the risk profile by selecting and deselecting variables virtually before construction starts. The result of the process is significant with reduction of up to 80% in change orders, a more stringent cost profile and totally minimized risk.
Hear how iTWO can create value in your construction project
Build a better budget and develop more accurate estimates
Build a better budget and develop more accurate estimates
RIB offers solutions for the oil and gas industry’s most common needs. Understanding that crew production and progress on a daily basis are at the top of the priority hierarchy for this industry, iTWO provides consistent monitoring and insight into these factors. From the first step of an oil and gas project, stakeholders can see visuals of, and manage, what’s been received, constructed, installed, and tested.
Build a better budget and develop more accurate estimates
Run virtual 5D simulations with different variables to reduce change orders and address contingencies to save time and money during project execution
Minimize risk and control the construction process
Utilize project funds more efficiently
Beat maintenance and project deadlines
See visual progress and schedule resources to optimize productivity
Minimize down time
Thanks to the 3D model, iTWO can extract the quantities based upon the design to enhance the estimating process, improve the benchmarking validation and enable values for engineering options to be undertaken in time with the design changes.
Time gained due to the synergy of integrating the 3D design to cost and time will significantly enhance and enrich the data sets of the project for all the professional disciplines involved. Initial analysis by construction customers suggest savings in time and cost potentially of up to 30%.
Early warning of design errors before building begins through clash detection. This will enable the commercial team to validate the design process prior to commencement on site and seek early resolution to variation and changes.
Quantities can be tracked in line within the design plan and actually be delivered on site for increased control and performance monitoring over the life cycle.
iTWO makes managing complex projects more transparent and more secure. Risk reduction can be achieved by integrating planning and design decisions within iTWO.
Changes to the building procedure and the resulting changes to costs and deadlines can be easily and clearly performed on the model.
Using RIB iTWO you can simulate different design variables, calculation processes and execution variables, which precisely follow, control and minimize the risk profile by selecting and deselecting variables virtually before construction starts. The result of the process is significant with reduction of up to 80% in change orders, a more stringent cost profile and totally minimized risk.
Hear how iTWO can create value in your construction project